Tuzla · İstanbul
She leaves better than she arrived.
A refit yard for owners who measure a yard by what it hands back.
Every refit is a promise about time. We publish how we kept it.
From arrival to redelivery
01 / 05
Arrival
She comes alongside and the agreed specification is verified on board — before a single tool is lifted.
Capability
Four yards. The largest takes ninety-five metres.
95m
Maximum vessel length, on the floating dock at Mengi Yay
588t
Travel lift capacity at Aykın
151,600m²
Across four facilities on the Marmara and the Aegean
250+
Specialists in house — not a subcontractor switchboard
Paint is the only work an owner inspects from fifty metres and from fifty centimetres.
The yards
Pick the envelope your vessel needs.
Mengi Yay — Tuzla
Max LOA
95 m
Floating dock
95 m
Wet berth
70 m
Cranes
20 t · 15 t · 10 t ×2
Covered sheds
4
Area
40,000 m²
Aykın
Max LOA
70 m
Travel lift
588 t
Wet berth
80 m
Cranes
15 t ×4
Area
28,000 m²
Kıyı İstanbul
Max LOA
70 m
Wet berth
70 m
Area
11,600 m²
Concurrent
3 projects
Didim
Max LOA
50 m
Travel lift
400 t
Wet berth
65 m
Crane
15 t
Area
72,000 m²
Inside
The part no photograph does justice to.
Drag →







Why owners come back
A refit’s only real risk is the surprise.
Scope changes are raised in writing and priced before they are worked. You approve a number, not a feeling. Every finding reaches your representative with a photograph attached.
The record
Fifteen projects. Every one of them dated.
R15M/Y Mirabella47.85 m · 2026
R11M/Y Grand Rusalina60 m · 2024
R13M/Y Zima23.12 m · 2024
R12M/Y Hayat2024
R10M/Y Solaris2024
R09M/Y Saadet Sultan2023
R08M/Y Isra2023
Send us the spec. We will send back a schedule.
Tell us the vessel, the window and the scope. You get a dated plan and a named project manager — before any commitment.